Transit Safety Solutions

Platform Screen Doors in Naoriya Pakhanglakpa

TRAC Engineering delivers world-class Platform Screen Door solutions for Naoriya Pakhanglakpa metro and rail networks - combining indigenous manufacturing, precision engineering, and proven reliability under one roof.

Enhanced Passenger Safety
Made in India
93% Indigenous Components
Platform Screen Door System Naoriya Pakhanglakpa
93% Indigenous Components
19K Sq. Ft. R&D Facility
20+ Expert Engineers
100% Made in India

About TRAC Engineering

TRAC Engineering Private Limited, a strategic joint venture between Toshi and CECO, is formed to design, manufacture, install, commission, and maintain high-quality Platform Screen Door (PSD) systems across Naoriya Pakhanglakpa and India.

Unlike other PSD suppliers, our in-house production reduces dependency on imports, ensures faster delivery and support for Naoriya Pakhanglakpa projects, and enables better cost control for transit authorities.

Full-stack PSD - design, manufacture, install, commission & maintain
Faster delivery & on-site support across Naoriya Pakhanglakpa transit projects
Cost-effective - no import dependency, fully indigenous supply chain
TRAC Engineering PSD Corporate Office Naoriya Pakhanglakpa

Built for Modern Transit

Every feature of our PSD system is engineered to deliver maximum safety, efficiency, and reliability for Naoriya Pakhanglakpa's metro and rail networks.

Enhanced Passenger Safety

Prevents accidental or unauthorized access onto tracks. Obstacle detection sensors and emergency override features ensure continuous safety across all Naoriya Pakhanglakpa metro platforms.

Operational Efficiency

Reduces delays caused by safety incidents, optimizes dwell time, and synchronizes seamlessly with train door systems for precise, reliable operation at every Naoriya Pakhanglakpa station.

Energy Savings

Minimizes air loss in underground Naoriya Pakhanglakpa metro stations, significantly reducing HVAC load - resulting in measurable energy savings for transit authorities.

Optimized Staffing

Reduces dependency on platform staff through automated door control and real-time monitoring - lowering operating costs for Naoriya Pakhanglakpa transit operators.

Remote Diagnostics

Advanced monitoring system provides real-time fault alerts and remote diagnostics, enabling faster maintenance response and maximum uptime across Naoriya Pakhanglakpa PSD deployments.

Made in India

Proudly manufactured in India with over 93% indigenous components - supporting Atma Nirbhar Bharat, generating local employment, and ensuring cost-effective PSD solutions for Naoriya Pakhanglakpa projects.

PSD System Showcase

Full Height and Half Height Platform Screen Door systems - designed, manufactured, and tested in India for Naoriya Pakhanglakpa metro and rail networks.

Platform Screen Door System Overview Naoriya Pakhanglakpa
PSD Door Closed Position Naoriya Pakhanglakpa
Door in Closed Position
PSD Door Open Position Naoriya Pakhanglakpa
Door in Open Position
Full Height Platform Screen Door Naoriya Pakhanglakpa
Full Height PSD
Half Height Platform Screen Door Naoriya Pakhanglakpa
Half Height PSD

PSD Operation in 5 Steps

From train arrival to passenger boarding - how TRAC's PSD system manages every step automatically at Naoriya Pakhanglakpa metro stations.

1
Train Approaches

Station system receives train arrival signal from the ATC/signaling system.

2
PSD Unlocks

PSDs unlock and align with train doors ready for synchronized opening.

3
Doors Open

Train and platform doors open simultaneously - safe, controlled passenger flow.

4
Obstacle Check

Sensors confirm no obstruction before doors close - safety always first.

5
Doors Close

PSDs lock securely - train departs safely and platform is fully secured.

Why PSD Systems Matter

Transit authorities and commuters in Naoriya Pakhanglakpa gain measurably from a well-installed Platform Screen Door system.

Accident Prevention

Eliminates risk of passengers falling or being pushed onto Naoriya Pakhanglakpa metro tracks - creating a fully secure platform environment 24/7.

Climate & Air Quality Control

Separates platform air from tunnel air - allowing Naoriya Pakhanglakpa underground stations to maintain comfortable temperatures and reduce HVAC costs.

Reduced Delays

Synchronized PSD-train door operation minimizes dwell time at every Naoriya Pakhanglakpa station, improving overall network punctuality.

Reduced Trespassing

Physical barriers prevent unauthorized track access at Naoriya Pakhanglakpa metro stations, improving safety and reducing liability for operators.

Lower Maintenance Costs

PSDs limit dust and debris flow onto tracks - reducing cleaning frequency, equipment wear, and overall maintenance expenses at Naoriya Pakhanglakpa stations.

Scalable Across Network

TRAC's PSD systems can be expanded to new lines and stations across Naoriya Pakhanglakpa without overhauling existing infrastructure or signaling systems.

Technical Specifications

Engineered to meet global safety and performance standards for metro and rail deployments across Naoriya Pakhanglakpa.

Parameter Specification
PSD TypeFull Height & Half Height
Door Width1400mm – 1800mm (customizable)
Door HeightUp to 2400mm (Full) / 1400mm (Half)
Opening Time< 3.5 seconds
Closing Time< 3.5 seconds
Operating Voltage24V DC / 110V AC
Obstacle DetectionInfrared Sensors + Mechanical Override
Communication InterfaceRS-485 / Ethernet / CAN Bus
Operating Temperature-10°C to +55°C
Ingress ProtectionIP54 & above
CertificationEN 14752 / IEC Standards Compliant
Indigenous Component %93% & above
TRAC Engineering PSD R&D Facility Naoriya Pakhanglakpa
93% Indigenous
Components

World-Class Engineering Infrastructure

Driven by a highly skilled technical team with rich multi-disciplinary expertise, our PSD solutions reflect deep research, precision engineering, and practical innovation tailored for Naoriya Pakhanglakpa's transit environment.

Supported by a world-class manufacturing setup and advanced testing infrastructure, over 93% of components are indigenously developed - ensuring customization, quality control, and reduced import dependency for every Naoriya Pakhanglakpa PSD project.

  • Dedicated Lab and Engineering facilities spread across 19,000 sq. ft.
  • 20+ qualified and experienced engineers with proven PSD expertise.
  • Modern IT infrastructure with in-house servers and remote monitoring capabilities for Naoriya Pakhanglakpa deployments.
  • Simulation-backed methodology - every PSD meets global performance, safety, and reliability standards.

Enhance Your Transit Infrastructure in Naoriya Pakhanglakpa Today

Looking to improve safety, efficiency, and passenger experience at your Naoriya Pakhanglakpa metro or rail stations? TRAC Engineering provides world-class PSD solutions tailored to your exact project needs.

Get in Touch

Frequently Asked Questions

Everything you need to know about our Platform Screen Door systems, installation process, safety features, train compatibility, and after-sales support services for Naoriya Pakhanglakpa metro and rail projects.

What are Platform Screen Doors (PSDs) and why are they important?

Platform Screen Doors are automated barriers installed between the station platform and the train at Naoriya Pakhanglakpa metro stations. They prevent passengers from accidentally falling onto tracks, block unauthorized access, reduce noise, improve air conditioning efficiency in underground stations, and significantly enhance overall passenger safety.

Are TRAC's PSD systems compatible with all train types?

Yes. TRAC Engineering customizes each PSD system to ensure seamless integration with various train models, ATC/ATP signaling systems, and platform dimensions - making our PSDs compatible with any Naoriya Pakhanglakpa metro or rail network without disrupting existing infrastructure.

What is the difference between Full Height and Half Height PSD?

Full Height PSDs (up to 2400mm) extend from floor to ceiling and provide complete platform-to-track separation - best suited for underground Naoriya Pakhanglakpa metro stations requiring climate control and maximum safety. Half Height PSDs (up to 1400mm) are ideal for elevated or open-air platforms where full enclosure is not needed, offering cost-effective safety.

How long does it take to install a complete PSD system?

Installation timelines depend on platform size and complexity. On average, TRAC Engineering completes full PSD deployment within 4 to 8 weeks per Naoriya Pakhanglakpa station - including system integration, commissioning, safety testing, and operational handover.

What safety features are included in TRAC's PSD systems?

TRAC's PSD systems include infrared obstacle detection sensors, emergency manual override, interlocking mechanisms synchronized with train doors, and power backup for uninterrupted operation - ensuring continuous passenger safety across all Naoriya Pakhanglakpa metro platforms at all times.

Can PSDs help reduce station maintenance and operating costs?

Yes. TRAC's PSD systems limit dust, debris, and air flow onto the trackbed - reducing cleaning frequency, minimizing equipment wear, lowering HVAC energy consumption, and decreasing overall maintenance expenses for Naoriya Pakhanglakpa transit authorities.

Does TRAC offer after-sales support and maintenance for PSD systems?

Absolutely. TRAC provides comprehensive Annual Maintenance Contracts (AMC), 24/7 remote monitoring, preventive maintenance schedules, software updates, and on-site servicing - ensuring maximum PSD uptime across all Naoriya Pakhanglakpa deployments throughout the system's lifetime.

Which other cities in Manipur does TRAC Engineering serve with Platform Screen Doors solutions?

Apart from primary service areas, TRAC Engineering also provides Platform Screen Doors installation and maintenance in other cities of Manipur and across India, including Andro, Bijoy Govinda, Bishnupur, Churachandpur, Heriok, Imphal, Jiribam, Kakching, Kakching Khunou, Khongman, Kumbi, Kwakta, Lamai, Lamjaotongba, Lamshang, Lilong, Mayang Imphal, Moirang, Moreh, Nambol, Ningthoukhong, Oinam, Porompat, Samurou, Sekmai Bazar, Senapati, Sikhong Sekmai, Sugnu, Thongkhong Laxmi Bazar, Thoubal, Torban, Wangjing, Wangoi, Yairipok.

Contact Us

Have questions about our one of our Urban Mobility solutions or need a customized quote? Get in touch with TRAC Engineering - we're here to assist you.

Address

TRAC Engineering Pvt. Ltd. Skymark One, Sector 98, Noida, Uttar Pradesh 201303

Call Us

+91 9315950739

Loading
Your message has been sent. Thank you!